Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

"Vostochny Port" prepared for winter

"Vostochny Port" prepared for winter
Photo: Vostochny Port JSC

Vostochny Port JSC, the largest coal terminal in Russia, is ready to operate at low temperatures. All equipment has been serviced and tested, measures for defrosting coal and reducing dusting at low humidity and frost have been included in the production chain.

According to the press service of Vostochny Port JSC, all machinery and equipment received passports of readiness for the winter period. One of the most important technological stages in the winter period is coal defrosting using a unique system that is capable of simultaneously heating 160 gondola cars. Then they are fed into covered tippers, overcoming a distance of 600 meters along a corridor equipped with windproof walls and infrared emitters.

As emphasized by the acting. Andrey Osavlyuk, Chief Engineer of the Specialized Coal Complex of Vostochny Port JSC, the entire process chain is built in such a way that, with the help of special equipment and in winter, coal transshipment takes place smoothly and without interruption, eliminating negative impact on the environment.  
January 26: current information on coronavirus in the Far East
Digest of regional events and latest statistics