Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

The order of the Government of the Russian Federation on holding in 2014 the auction for the right to use the oil and gas condensate deposit of federal significance (Lebedinsky)

The government signed an order to hold in 2014 an auction for the right to use a subsoil plot of federal significance, including a part of the Lebedinsky oil and gas condensate field located in the Sea of ​​Okhotsk, to explore and produce hydrocarbons. This is reported today on the official website of the Government of the Russian Federation.

The document was developed on the basis of the requirements of the Law of the Russian Federation "On Subsoil".

The law stipulates that "decisions on holding auctions for the right to use subsoil plots, on the composition and procedure for the work of auction commissions, and determining the procedure and conditions for holding such auctions for each subsoil plot or group of subsoil plots of federal significance are made by the Russian government.

As an object of the auction, the Eastern Coastal area of ​​the bowels with an area of ​​3,6 sq km is proposed.

East Russia Help

The Lebedinsky subsoil area is located within the shallow part of the Sea of ​​Okhotsk at a distance of 3 km. from the coast and borders on two fields Odoptu (Sakhalin-1 project) and Odoptu-more-North dome (LLC RN-Sakhalinmorneftegaz).

Potential resources according to DeGolyer & MacNaughton's assessment as of December 31.12.2010, 12: oil - 5,4 million tons, gas - XNUMX billion m³.

The license for geological exploration for the purpose of searching for and evaluating hydrocarbon deposits at the site of Lebedinsky NK Rosneft received in 2007. Since 2009, the project management work is carried out by a specialized subsidiary company - RN-Shelf-Far East CJSC.

Earlier, in the 2011 year, the media reported that Rosneft announced the opening of a new oil and gas field Lebedinsky, located on the shelf of Fr. Sakhalin, with a preliminary estimate of recoverable reserves of at least 3,3 million tons on the southern dome of the structure under study.

When testing the exploration well #1 at the Lebedinsky license area, the column received a flow of oil with a flow rate of up to 150 cubic meters / day.

The prospecting work is carried out in full compliance with licensing obligations and environmental protection measures are carried out in accordance with the highest industry standards. During the drilling of Lebedinskaya No. 1, a number of unique technical solutions were applied.

September 25: current information on coronavirus in the Far East
Digest of regional events and latest statistics