Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

The construction of the "Force of Siberia" is estimated to require about 800 billion rubles

The construction of the Power of Siberia gas trunkline will require approximately 770 billion rubles. This was reported by the ITAR-TASS news agency with reference to materials prepared for the solemn ceremony of connecting the first link of the Power of Siberia gas pipeline, which will be held in Yakutia with the participation of Russian President Vladimir Putin.

The gas pipeline will become a common gas transmission system for the Yakutsk and Irkutsk gas production centers. Gas will be supplied through it both for export to China and on the domestic Russian market. The total length of the gas pipeline will be 3 km. At the first stage, a section of the Chayandinskoye oil and gas condensate field - Blagoveshchensk will be built.

In May this year, Gazprom and China's CNPC signed a 30-year contract for the supply of Russian gas. The total amount of the contract is about $ 400 billion, the volume of supplies is 38 billion cubic meters of gas annually.

January 17: current information on coronavirus in the Far East
Digest of regional events and latest statistics