Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

Start-up works of gold extraction equipment are being carried out at the Pavlik mining and processing plant

Currently, the mine’s readiness for exploitation is 100%, work is underway to set up gold extraction equipment of the largest world-class companies, manufacturers Caterpillar and Atlas Copco, the press service of the government of the Magadan region reports.

At the same time, gold-bearing ore is being mined. Yesterday, during a visit to Pavlik, Governor Vladimir Pechenyi initiated a rock explosion.

As the acting director of the mining and processing plant Vladimir Chernov told the governor, the equipment - mills for grinding ore are now being tested under a load of 30%. “After this, we plan to start the mills under the load of 60%, then, if no additional setup is required, we will give a full load. If at the 100% loading all the necessary technical parameters of the work are met, the commissioning can be considered completed and the factory can be put into operation. ”- said Vladimir Chernov. It is assumed that this will happen before the end of April 2015.

According to the Ministry of Natural Resources of the Magadan Region, the balance reserves of the Pavlik deposit are 153,9 tons of gold and 39,7 tons of silver. It is planned to increase reserves to 250 tons. The volume of investments in exploration, research, geological exploration, and construction accounted for more than 10 billion rubles. It is planned that gold production in 2015 g will be 1,5 tons. 

January 17: current information on coronavirus in the Far East
Digest of regional events and latest statistics