Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

1 December cargo pontoon bridge between China and the Amur region of the Russian Federation will start working

Cargo pontoon bridge between China / Heihe City / and the Amur Region / Blagoveshchensk / is planned to open for traffic from 1 December. This is reported by the Ministry of Transport and Roads of the Amur Region.

After the survey of the Russian part of the cargo pontoon bridge across the Heilongjiang / Amur River / between Heihe and Blagoveshchensk, the regional interdepartmental commission for monitoring the condition of the floating / pontoon / bridges estimated that the state of the bridge is in compliance with the standards. Also, the commission recommended that the operating organization limit the load on the bridge / no more than 30 tons / until the metal structures / pontoons completely freeze.

The planned date for the beginning of operation of the cargo floating / pontoon / bridge is 01 December 2014.

The pontoon crossing allows the cargo to be shipped after the navigation is over in Heilongjiang / Amur /, the fairway of which passes the state border between China and Russia. During the warm season between the Heihe and Blagoveshchensk, motor ships cruise, and in the off-season, ships on an air cushion.
January 26: current information on coronavirus in the Far East
Digest of regional events and latest statistics