Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

TOSER "Komsomolsk"

All information about TOSER "Komsomolsk" - in a special section on the portal EastRussia

TOSER
TOSER "Komsomolsk" - located on sites in the cities of Komsomolsk-on-Amur and Amursk Khabarovsk Territory. It consists of three sites: "Sail", "Amurlitmash" and "Amursk".

Presentation video TOSER "Komsomolsk"



TOSER "Komsomolsk"

State support for the creation of infrastructure - 1,23 billion rubles. (0,9 billion rubles - funds of the federal budget, 0,33 - regional budget and extra-budgetary sources).

Consists of three sites, including:


1. The "Parus" site: an area of ​​59,4 ha

Free land plots: about 45 ha


Anchor investors:
- LLC "Epsilon-2" (production of parts for aircraft construction),

The site in the area of ​​the Parus plant is provided for the creation of high-tech enterprises and the location of production facilities for machining parts, cutting tools and composite materials, and other industries. Type: Greenfield

Activities to create an infrastructure for 2016-2018:

Electric power supply Up to 30 MW
Gas Up to 1,7 thousand m3 / hour
Roads Reconstruction and construction to 3,6 km of highways
Water supply Up to 1,8 thousand m3 / hour
Wastewater Up to 1,8 thousand m3 / hour
Heat supply Up to 4,3 Gcal / hour

2. The Amurlitmash site: an area of ​​62,2 ha

Free land plots: about 45 ha

The site of the plant "Amurlitmash" is proposed for the organization of the machining industry, machine building, food industry and other industries. It has supplied railroad tracks, loading and unloading areas equipped with overhead cranes. Type: "brownfield"

Activities to create an infrastructure for 2016-2018:

Electric power supply Up to 6,6 MW
Gas Up to 2,5 thousand m3 / hour
Water supply to 0,24 thousand cubic meters / day
Wastewater to 0,7 thousand cubic meters / day
Heat supply 30 Gcal / h
Roads Reconstruction and construction of 2,2 km of highways

3. Platform "Amursk": area 97,3 ha

Free plots of land: -


Anchor investors:
- LLC "Amur Timber Industry Company" (development of a center for deep wood processing based on the production of veneer and lumber, pellets, house kits).

The site is proposed for the organization of various types of production, has a railroad track. Type: "brownfield".


Provision of infrastructure:

Electric power supply 10 MW (free power)
Gas No
Water supply 1 thousand m3 / day
Wastewater Centralized
Heat supply 31 Gcal / hour (free power)

Links:

Submit Application for the status of the resident of the TOP Komsomolsk
(Site of the JSC "Corporation for the Development of the Far East")

Go to the website Investment and Development Agency of Khabarovsk Krai



October 23: current information on coronavirus in the Far East
Digest of regional events and latest statistics